Large Solar Lights Outdoor Hanging Lanterns 12 Pack, Rustic Iron 4.3" Ball Solar Tea Lights with Flickering Flame Candle, Waterproof Hanging Lights for Backyard Patio Garden Fence Tree Pergola Décor

Large Solar Lights Outdoor Hanging Lanterns 12 Pack, Rustic Iron 4.3" Ball Solar Tea Lights with Flickering Flame Candle, Waterproof Hanging Lights for Backyard Patio Garden Fence Tree Pergola Décor

$107.98
Skip to product information
Large Solar Lights Outdoor Hanging Lanterns 12 Pack, Rustic Iron 4.3" Ball Solar Tea Lights with Flickering Flame Candle, Waterproof Hanging Lights for Backyard Patio Garden Fence Tree Pergola Décor

Large Solar Lights Outdoor Hanging Lanterns 12 Pack, Rustic Iron 4.3" Ball Solar Tea Lights with Flickering Flame Candle, Waterproof Hanging Lights for Backyard Patio Garden Fence Tree Pergola Décor

$107.98

Product Details

  • Color: ‎Warm
  • Material: ‎Metal
  • Style: ‎Rustic
  • Product Dimensions: ‎4.29 x 4.29 x 4.3 inches
  • Item Weight: ‎5.52 pounds
  • Power Source: ‎Solar Powered
  • Included Components: ‎Glass Globe
  • Batteries: ‎1 AAA batteries required. (included)
  • Item model number: ‎PASO075ABC
  • Part Number: ‎YSSO002ASW
  • Shape: ‎sphere
  • Assembled Height: ‎4.3 inches
  • Assembled Length: ‎4.29 inches
  • Assembled Width: ‎4.29 inches
  • Item Package Quantity: ‎12
  • Number of Lights: ‎12

About this item

  • Larger Solar Balls & Panel: Crafted from high-quality rust-proof iron, these charming ball-shaped lanterns (4.3" diameter) come with a 12-inch hanging chain and hook, adding timeless elegance to any outdoor space.
  • Magnetic Anti-Tip Design: A built-in magnetic base securely holds the flickering candle in place, ensuring it stays put even on windy days—no more worrying about tipping.
  • Solar-Powered & Eco-Friendly: Absorbing sunlight by day, these lights automatically illuminate your garden for 8-10 hours at night. Hassle-free, energy-efficient, and completely no need to wire.
  • All-Weather Durable (IP44): Rated IP44 waterproof and coated with a rust-resistant finish, these lanterns are built to withstand the elements, ensuring lasting beauty without corrosion.
  • Versatile Decor: Place it on a table or hang it from trees, fence posts, or patio covers. It’s an ideal decorative lighting solution for your yard, lawn, garden, or landscape.

You may also like